Aztec Drills 70.1 Meters of 0.80 g/t AuEq (0.49 g/t Au and 16.85 g/t Ag) from Surface in TR26-54 at the Tombstone Project, Arizona
Aztec Drills 70.1 Meters of 0.80 g/t AuEq (0.49 g/t Au and 16.85 g/t Ag) from Surface in TR26-54 at the Tombstone Project, Arizona
CEO Dyakowski: “TR26-54 and TR26-60 were drilled as step-outs to the east and west of our previously reported holes, and both returned broad zones of oxide gold-silver mineralization.”
Aztec Minerals Corp.
Tue, 11/10/2026 – 08:43